Project Name: Daqing Petrochemical 120 tons / year ethylene expansion project three chemical plant sewage treatment project
Project time: March 2013
Project location: Daqing, China
In order to make the industrial wastewater from chemical plant does not pollute the environment, can be reused, the factory decided to built water treatment project. The water treatment project a total of 4 sewage tanks, the total volume of 4 cubic meters, an average of 300 tons per hour to deal with -400 tons. So need a lot of switch valve to control the size of water.
Kelk (kelk) high performance butterfly valves to be used in the project, butterfly valve flow capacity, switching freely, to achieve higher levels of customer requirements, and Kyle grams performance butterfly valve to achieve zero leakage, so the water processing project of butterfly valve closed after the death will not produce leakage.